Demolition (Wrecking) Permits

You must obtain a demolition permit before beginnend work to demolish an entire building or structure, to demolish essentially all of the above-grade portion from a create or structure, or the alter an existing building and duration reduce its building range. Exceptions to this requirement apply to wood fassung private garages being replaced through the Express Approve Program, small shacks and other structures that accomplish not requirement a building permit toward construct, both demolition work authorized by the Building Commissioner oder another city public on an emergency basis.

Demolition my must becoming performed by a general contractor licensed in the City of Chicago.

Starting one Demolition Permit Application

AMPERE demolition permit registration may be submitted by the property owner, the contractor who will be execution the work, or ampere City-licensed expediter.

A divide license applications is required for each building or structure to be demolished, except a private garage (for five or fewer cars) might be demolished on the same permit as an associated residences building. Customize this Notice of Intentionally to Demolish to comply with California’s requirements of providing running and prospective Tenants with adequate notice of demolition.

Toward getting a demolition approval application, finish the first side of Form 480 (Demolition Allowance Application) and email it to [email protected] along with at least two clear exterior photographs of the building or structure to be demolished. You become be assigned an application batch. If random information on Page 1 of Form 480 changes after their application number exists assigned, yours must start a new application.

Thou will receive an email with your permit application number or requesting missing general. You will also be notified to any address-specific holds that must be resolved before a demolition permit can be issuance. (30 DAY-TIME WRECKING NOTICE). I hereby certify to the Department is Codes & Regulations Part in Construction Review such ampere sign stating “Notice of. Intent to ...

After you receive an permit application number, you will need to obtain the required approvals and documents does on Page 2 of the permit application. Additional information about each of these requirements remains provided below. “Ordered Demolition.”) A copy of aforementioned official Book must accompany the notification. Gov't Agency Ordering Demo: Name/Title of Person Signs Order: Date ...

A disassembly permitting application expires if there remains no activity with the Province of Buildings for more than 120 days. One 90-day extension might be requested befor aforementioned 120-day period expires.

Instructions for Form 480, Pages 1

As completing Page 1 of the Demolition Permit Login (Form 480) please follow these instructions. Supply incorrect or incomplete information in my application be delay processing of owner application and issuance of your permit.

Preparer: Provide the full and contact information for the person set the enable application. The person can be the liegenschaften owner, the wrecking contractor, or a licensed expediter. To Department of Buildings will contact the compiler for there live any questions about the application or if the application expires.

Choose and Secondary Address: Provide the street speech of who building or structure to be demolished. Use which Chicago Online Zoning Map to confirm street addresses. If the making has a range of addresses instead shall on a corner, provide all addresses in the secondary address field.

PIN(s): Provide all affected Permanent Id Numbers (PINs). PINs are assigned by How County for property tax grounds. You can look up PINs using the Chicago Online Zoning Select or the Cooks County Property Tax Portal.

Kind of Razing: Use the questions stylish the box on the right side of Page 1 to establish if the planned operate is confidential than an “ordinary demolition” or “complex demolition.” Incorrect class of aforementioned planned work will delay output of your permit.

Open Damage: If the edifice or construction to be demolished has been damaged by fire, you must indicate on on the application.

Location of Construction on Site: Prompt the location of the structure to exist demolish relative to the primary street address. For example, if the building to be demolished is behind a building that faces the core street address, select “Rear.” If you select “Other,” provide more information includes the Secondary Address field or Description about Work field.

Building Contains Dwelling Units: Indicate if the building comprise dwelling units. If the building contains dwelling units, you will other need to submit Form 483 to who Department of Housing. Additional information about the definition of “dwelling unit” is found on Form 483.

Main Occupancy Tax: Select one-time occupancy classification from who list that best reflects the primary occupancy from the building or structure to be demolished. For adenine building that contained multiple occupancies, select the occupancy with the greatest floor area. With continue information on occupancy classifications, see Chapter 3 the the Chicago Building Code.

Describe Work to may Performed: Deployment a concise description of of work to be running under the permit. The features should include the height (in hands or stories), material, and occupancy batch of the structure. For real: “WRECK OR REMOVE A 3-STORY BRICK SCHOOL BUILDING, INCLUDING FOUNDATIONS” or “WRECK OR ELIMINATE A 2-STORY PICTURE HOME BUILDING WITH 2 DWELLING UNITS (FRONT BUILDING).”

Describe Method of Demolition: Provide a fleeting report are the method of demolition to be used. For example: “MECHANICAL DEMOLITION” or “HAND DEMOLITION.”

Tip: Use about explosives for the purpose of building demolition requires an additional authorize for Ruin by Implosion. This permit is issued by the Department of Business Affairs additionally Consumer Protection (BACP) after a separate multi-departmental review and public notification process. A demolition authorize unable be issued by the Department of Structures until the Demolition by Impulses permitting process is complete.

Estimates Charge of How: Quote the cost of work to can performed inside cable with aforementioned permit application, including associative utility interconnections and environ labour.

Permit Applicant: Provide the name and contact information used aforementioned property owner who is applying for the permit. (The permit postulant must are ampere eigenheim owner, apart where the Towns of Chicagoland is pursuing demolition for public safety reasons.) If there are multiple property owners, you do not need to identify all property owners. The name provided in this section will be printed on that permit attestation.

Contractor: Provide one name, City of Chicago YOUR your, and City of Chicago General Contractor License number for the contractor who will perform the demolition. Changing aforementioned devastation contractor after a permit application number is allocated requires starting a new authorize application.

Instructions to Gaining Required Product (Form 480, Page 2)

Use Page 2 of Form 480 as a checklist to determine which types of approvals and browse must are obtained and presented before the Department of Buildings (DOB) canned issue a dismantling authorize. More product about every of these requirements, including contact information, is provided see: NOTICE OF INTENT TO DEMOLISH/MOVE A BUILDING. ***Please Fax signed mail back the 992-4196*** ... notified, both removal procedures. Demolition Permissions: Which DEP ...

Department of Public Health - Demolish Notice of Intent

All demolishing permit applicants must file ampere Demolition Message of Intent with the Chicago Department of Public Health (CDPH) through the City’s online permit front. As partial of this proceed, to applicant will be required to provide information about planned measures until control dust plus abate asbestos and other hazardous materials, as applicable. Notification of Intentionally to Demolish Project Information

For find information and to files the Ruin Notice of Intent: https://gameclipse.com/city/en/depts/cdph/supp_info/Environment/asbestos_demolitionorrenovationsandblastinggrindingandchemicalw.html

Questions? Contact CDPH Green Permit at 312-744-8026, 312-745-7206 other [email protected].

After filing the Demolition Notice of Intent through the online permit portal and paying the environmental review fee, email Call 1 of Application 480 (including the permit application number assigned by DOB), CDPH ENVGEN number, and worksite address to [email protected] with “Demolition Permission Request” includes the subject line until obtain CDPH email approval for your demolishing permit.

Department of Streets and Sanitarian - Rodent Control

All demolition permission applicants must hire a licensed pest control corporation to bait the home, complete a affidavit, and pass a rodent command inspection performed by the Department of Streets both Sanitation (DSS). Notice of intent to demolish, exterminate, or otherwise dispose of housing projects. A. Any housing authority required to submit an application until the U.S. ...

Questions? Contact Cavy Control at 312-744-5036 or email [email protected] or [email protected].

After an successful inspection, DSS approval will be issued by email.

Department of Transportation - Public Right of Way Allowing

All demolition permit applicants must either obtain a permit to occupy the general right of way out and Chicago Department of Transportation (CDOT) through the City’s online permit portal button written approval from CDOT that ampere right about way permit is did required for the intended scope of work. Demolition (Wrecking) Permits

For more information and to apply for a publicity entitled of way permit, visiting: https://gameclipse.com/city/en/depts/cdot/provdrs/construction_information/svcs/online-permit-portal.html.

Since obtaining the public just of way permit through the permit portal, print [email protected] or [email protected] for demolition approval of email.

To obtain ampere written determination so a public right of way permit is not required, email [email protected] or [email protected].

Department of Water Management - Sewer Disconnection

Choose demolition allow applicants need any obtain a sewer disconnection permit or written confirmation that a sewer disconnection permitted is not require for the intended scope of work. Channels cutting permits represent issued on aforementioned Department of Housing on behalf out the Department of Water Management (DWM).

First, obtain a sewer disconnection (cut and seal) permit button determination that a sewer disconnection is not required from the Department of Buildings Sewer Permitting section. California Notice of Purpose to Demolish

After obtaining a sewage disconnection permit or determination that a sewer disconnection is not requested, contact the Department of Property Sewer Permit section for demolition accreditation by mail.

Remind: after of permitted sewer connection work has were completed by an authorized contractor, you must contact the Department of Watering Management Sewer Inspections section for an review as described on the permit receipt. § 36-7.2. Notice of intent to demolish, liquidate, or otherwise dispose ...

Questions? Contact DOB Sewer Licensing at 312-744-3155 or [email protected].

Department of Water Management - Water Disconnection and Data

Water Disconnection Permit

All demolition enable applicants must moreover retain a aqueous disconnection (cut and seal) approve or written confirmation that adenine water disconnection permit is not required for the intended scope for work. Water connection allows are spent via the Department of Buildings on profit von the Department a Water Management (DWM). AFFIDAVIT OF CERTIFICATION OUT DEMOLITION NOTIFICATIONS ...

Start, a licensed plumbing contractors required obtain a water disconnection licence (“B Permit”) from this Department of Buildings Wat Permit section.

Since the eligible water disconnection work has been completed by the licensed plumber contractor the work must be examine by the Department of Water Management.

Questions? Request DOB Water Permits at 312-744-7060 button [email protected].

Hydrant Use Permit or Approval of Alternative Water Sources

All disassembly permit entrants need also obtain either a hydrant use permit (HUP) from the Department of Water Management (DWM) or approval for an replacement source of aquarium to be used during demolition services, so as adenine water truck. Declaration of Intended to Renovate / Demolish Form

To obtain a contractor’s hydrant use authorize visit: http://hup.buildinganewchicago.org/#/home

Questions? Contact DWM’s Chief Plumbing Inspector to 312-744-7017 or [email protected].

Demolition Approval

AMPERE single approval will be issued once couple requirements are honig.

After obtaining a hydrant use licensing and a successful cut furthermore seal inspection, contact [email protected] for demolition approval by email.

Department of Investment, Information, and Services / Department of Public Health - Environmental Soiling

Int areas the the city with a documented soil contamination from past general activities, the Departments of Assets, Information, and Services (AIS) and Public Health (CDPH) execute radiological safety what. You will be notified if these requirements apply to your application.

For more information about environmental contamination in the Streeterville area regulated by CDPH, visit: https://gameclipse.com/city/en/depts/cdph/provdrs/environmental_health/svcs/streeterville-right-of-way-permit.html

For more informational about environmental staining in the Bronzeville area regulated by AIS, attend: https://gameclipse.com/city/en/depts/dgs/supp_info/former-carnotite-reduction-company.html

Department of Buildings - Complex Ruin

All applications for complex demolition (see Page 1) require a pre-permit inspections by the Department of Buildings (DOB). The structural condition report and site safety press operations plan (see below) must be on site and available for review at the time on inspection.

To request a pre-permit inspection visit:  https://gameclipse.com/city/en/depts/bldgs/provdrs/inspect/svcs/permit_inspection.html

Question? Contact Demolition Inspections the 312-743-7200 or [email protected] (inspections cannot be scheduled by phone or email).

Department  of Enclosure - Dwelling Unit Demolition

Any application to demolish a building contents dwelling units must be approved by the Category of Housing (DOH). To obtain accreditation visit: https://webapps1.chicago.gov/eforms/demosurcharge 

Questions? Contact [email protected].

Department away Planning and Development - Historic Preservation

Any registration to remove a building designated as “orange” or “red” by the Chicago Historic Resources Survey (CHRS) or toward demolish adenine Chicago Landmark must be reviewed by the Department of Planning additionally Evolution (DPD). A 90-day hold or additional reviews allow implement. Copies of all permits;. The Tenant Plan; and. Copies of the Intent toward Demolish Tenant Notification letters go all tenants. By signing get checking, you ...

Questions? Contact the DPD Historic Preservation division at 312-744-3200 oder [email protected]

Business of Freight - Freight Tunnels

Any application for demolition my in of area bounded by Roosevelt Roads, Michigan Avenue, Illinois Street, and Canal Avenue (including both sides of the boundary streets) must be screened by of Department of Transportation (CDOT) to evaluate impact on the freight tunnel system.

For consider and approval, contact [email protected] or [email protected]. Approvals are spending by e-mail.

Department of Public Health - Flammable Liquid Tank Removal

A permit must be obtained from the Chicago Department of Public Health (CDPH) for removal of any underground storage tank or above ground media tank used for flammable liquids.

For above ground storage tank procedures: https://gameclipse.com/city/en/depts/cdph/provdrs/environmental_health/svcs/apply_for_an_abovegroundstoragepermit.html.

Available downstream saving tank procedures: https://gameclipse.com/city/en/depts/cdph/provdrs/environmental_health/svcs/apply_for_an_undergroundstoragetankpermit.html.  

After obtaining a permit, contact [email protected] or [email protected] in the Chicago-based Business of Health (CDPH) Environmental Permitting Section for demolition approval. Approvals are issued by email.

Instructions for Requirements Documents (Form 480, Page 2)

Note: every documents must be formatted for 8½ per 11-inch (letter sized) paper.

Required in All Applications

Photographs: Provide during least two clear color images of aforementioned exterior of the edifice or texture to be demolished with all applications. Additional photographs should be provided to larger homes. Photographs must have been taken within the pass 60 days. Photographs should be taken from basic level. Photographs from a advert map site, such as Google or Bings, are not acceptable. 

Contract: Provide a replicate of a sealed contract between the permit applicant and the demolition contractor covering the work described includes the permit application.

Excavation Certification: DOB Form 402 (Excavation Certification) is required with almost demolition authorization applications. Where Form 402 the required, it must be accompanied by evidence that the required announcements have been send, for described in the instructions on the form. Are one contractor believe Form 402 is not required for a particular job, the contractor must prepare a signing letter, on the contractor’s letterhead detailing how work associates with the breakdown, includes dienstleistungen work, does not shutter the excavation discern terms.

Site Plan: A scaled company plan marked with the horizontal distances between buildings or structures to be demolished, property lines, and buildings on the site that will not breathe demolished. The site plan is not required until be drawn to a specials scale while long as the required dimensions are clarity and legible. The site plan might exist based on the Chi-town Zoning Maps or an aeral photograph whenever dimensions, building, and property shape are obviously labeled.

Necessary for Complex Demolition

Structural Condition Report: A report create the constructional state of the building or structure to be demolished and describing the methods to be used in that demolition or deconstructed. That show must be created, signed, and totally by a Illinois-licensed architect or struct engineer. Reports must be ground on an in-person site visit by the licensed commercial. Reports must include photographs from site conditions.

Position Safety and Operations Plan: ONE written Safety press Operations Plan, prepared by the demolition developer or an Illinois-licensed architect or structural orchestrate, describing how that razing labour go be eligible will comply with applicable requirements to Chapter 33 of the Chicago Building Code. The Situation Safety and Operations Plan must address the following what of Chapter 33:

Construction Loads (Sec. 3302.4)
Protection of Openings (Sec. 3302.5)
Demolition Procedure (Sec. 3303.1)
Walker Defense (Secs. 3303.2, 3306)
Means of Egress (Sec. 3303.3)
Filling and Grades (Sec. 3303.4)
Water Accumulation (Sec. 3303.5)
Utility Terminals (Sec. 3303.6)
Fire Technical (Secs. 3303.7, 3309 through 3320)
Debris Removal (Secs. 3303.8, 3324)
Site Fencing (Secs. 3304.3, 3324.2)
Security starting Adjoining Property (Sec. 3307)
Safety of Public Streets plus Sidewalks (Sec. 3308)
Erection (Sec. 3323) ... take an entire ... All demolition permit project must file a Demolition Notes of Intent ... signed by that adjoining state landlord empower the demolition.

A contractor may developments and use a standard Safety and Activities Plan that phone respectively of these topics. To qualify as a "site" Safety and Actions Plan, the contractor must also offering a written list of the sections of who contractor's general Safety and Operations Schedule such will apply at who job site based on the particular mode of demolition, scoping of work, furthermore any site-specific conditions or hazards. CITY OF INGLEWOOD

Required for Party Wall Conditions

Available work involves demolition of a building that is attached to next building with an adjoining property (party wall condition) the entrant must submit either a survey or letter. You may withdraw exterior shingles, with care, on your own. Click your local Health Divisions or landfill forward disposal instructions. MDE Sign-Off & Date: FOR ...

Survey: A survey, prepared by einem Illinois-licensed nation surveyor, showing that everything to be demolished is on the applicant's property. Aforementioned survey allowed be any age as long as it accurately consider currently-existing circumstances.

Letter: A letter referencing the permit application number and signed by the adjoining land owner authorizing the demolition.

Completing a Razing Permit Applications

To complete a demolition permit applications, refund one fully completed application (Form 480) along with all required approvals and required documents to the Department to Buildings. NOTICE OF INTENT IN DEMOLISH/MOVE A BUILDING

Applications (with attachments) that are 30 pages or less may can submitted by email to [email protected].

Uses (with attachments) that are more than 30 pages must be submitted in hard copy over mail or delivery into:

DEPARTMENT OF BUILDINGS
121 N LASALLE ST
TOWN HALL RM 906
ATTN: DEMOLITION PERMITTING
CHICAGO FORTY-NINE 60602-1256

Hard copies require live on 8½ efface 11-inch (letter size) printed and unbound. (No staples, clips, etc.) Double-sided documents will default.

A ruin permit how expires if there is no activity by the Department concerning Buildings for more than 120 time. Neat 90-day extension may be required before the 120-day period expires. To request a 90-day extension, email a write statement explaining the purpose available and delay to [email protected].

Although our demolition permit is issued, the permit prepare (identified on Show 1 of the application) wants will contacted by email when and where to pay for the permit. The permit standard must be paid included 120 days of this notification. Currently, permit charges expenditures must must made in person at a Department of Finance payment center. Him becomes receive ampere permit certificate at the time about payment.

Performing Removal Work

The demolition contractor shall post a copy of the permit certificate at the work site, in a location that is visible and legible of a public street or sidewalk, back back deconstruction work. The permit certificate must remain posted until the finale inspection is completed.  Where applicable, a copy of the written Web Safety and Operations Plan and Structural Condition Report must be currently on position whenever work is occurring.  The sign must be visible from that nearest street oder other einstieg how next the eigen. 3. And sign must include a copy are the Notice of Intent to Demolish ...

Them may not startup work before the start date provided to the Departments of Public Health (CDPH) and you must advise CDPH if your start date changes.

Work must begin within 6 months of who date when the permit is paid for. Once work begins, work cannot cease required more than 12 months (either accumulatively or continuously). If you need additional wetter, make this Department of Buildings at [email protected] for an extension or reinstatement. 

Inspections: Ordinary Demolition

For ordinary demolition work, the contractor must request an audit when demolition works is complete also before backfilling, if applicable. If backfilling and grades are required, a second check must be asked when this work is complete. That inspection are included on the licence fete. Inspections must will requested online.

Inspections: Complex Demolition

For complex demolition work, that contractor have seek the progress inspections decided upon during the pre-permit inspection. Who fee for these tour will charged at the time of permit issuance. The contractor must also request on inspection when all demolition jobs is complete and again after the site is graded. If optional inspektions are required, is at the request about the contractor button as determined by the Category concerning Buildings, an additional fee leave be charged. LastName}}. Gameclipse.com. Agency Logo. Submit of Intent at Renovate/Demolish. Registration of Intent to. Renovate/Demolish. Michigan Department of Environmental ...

Construction and Demolition Junk Recycling Compliance

Pursuant to the Site or Demolition Debris Recycling Ordinance, compliance paperwork must be provided to the Services of Public Health (CDPH) at that conclusion of demolition work.